Deyuan Marine

We Aim To Be Your Best Partner
Home » Products » Other Life Saving Equipment » 15kn Handle Release Hook

loading

Share to:
sharethis sharing button

15kn Handle Release Hook

  • 15KN

  • 15kn

  • EC, CCS.

  • Ec,CCS.

  • DEYUAN MARINE

  • China

15KN handle release hook
Working instruction:
1. Move the hook to the hooking position when the fork handle is at unhooking position.
2. Move the fork handle down to the hook protector position by a flexible push rod then insert the protector into the protecting hole.
3. Turn the torsion spring on the hook, put down the lifting steel cord or the ring. Keep the torsion spring in loose status to prevent the cord dropping then start lifting a heavy object.
4. To carry a unhooking operation, take the protector out of the protccting hole then use the flexible push rod move the fork handle upward to the unhooking position the heavy object can drop from the hook freely.
5. Repeat the above hooking and unhooking operation. The hook can work normally when using it.

Repair and maintenance:
1. If find any part that is worn and torn or deformed, it should be replaced.
2. The active position should be lubricated regularly with grease.
3. The hook surface should be cleaned with sewing machine oil per two months and smear with clean sewing machine oil after cleaning to prolong the serice life.
Model Specification
 
Release form Safe   working   load
 
Test specification Test load for 2.5 times  Test load for 6 times  On the pitch Under the aperture
KN KN KN KN KN MM MM
DY-T15 15 Manual release 15 15 37.5 90 32 25
Previous: 
Next: